Infraconcrete← Back to home
Scaffolding Service · Erection + Dismantling · DOSH Competent Scaffolder

Scaffolding erection and dismantling in Malaysia.

DOSH-certified competent scaffolder crew erects GI tubular scaffolding to approved design, dismantles safely at end of project. We work on your material (if you have your own) or ours (if you want rental + erection in one). Standalone service (you handle the material, we erect) or bundled with rental, PE certification, and DOSH green tag inspection as part of our full service bundle. CIDB G7, ISO 9001:2015. Nationwide service from our Klang Valley yard.

DOSH certified
Competent scaffolder crew
Your material or ours
Flexible model
G7
CIDB highest grade
1-2 weeks
Crew mobilisation
01 / What our erection crew does

Six work phases.

  1. Pre-erection survey: walk-through of the site with the site team, confirm access, loading area, obstructions, services, and tie points. Confirm approved design matches site reality.
  2. Material lay-down and sorting: organise tubes, couplers, jacks, planks, and accessories on site in erection sequence.
  3. Erection: level base jacks on sole boards, erect standards with sleeve joints, add ledgers and transoms, lay platforms, add toe boards and guard rails, install ties per design, add bracing per design.
  4. Internal verification: site supervisor walks the completed scaffold against the design before handing over for inspection.
  5. DOSH inspection: competent person inspects and tags (green tag). This can be our DOSH-certified competent person or your appointed inspector.
  6. Handover: approved scaffold handed over to the user with tag visible at access point and inspection logbook on site.
02 / What our dismantling crew does

Reverse sequence.

  1. End-of-project survey: confirm scaffold ready for dismantling, user has vacated.
  2. Material removal in reverse of erection: bracing, ties, platforms, guard rails, transoms, ledgers, standards, jacks.
  3. Material sorting on site: tubes bundled by length, couplers in bins, jacks separated, planks stacked.
  4. Loading onto transport for return to yard or next project.
  5. Site clearance: all scaffolding material removed, work area cleared.
03 / Crew composition

Who is on the site.

  • Site supervisor (DOSH-certified competent scaffolder, holds green card).
  • Erection crew (DOSH-certified scaffolders, 3-8 persons depending on scope).
  • Rigger (for crane lifts of material to upper levels).
  • Site safety officer (for larger jobs or where client specification requires).
04 / DOSH competent scaffolder certification

The green card credential system.

Under the Factories and Machinery (BOWEC) Regulations 1986 and OSHA 1994, scaffolds in Malaysia must be erected, modified, and dismantled only by DOSH-certified competent scaffolders. The certification is evidenced by a green card issued after approved training and assessment. Our crew holds the right certifications for the work:

CredentialScopeOur crew
Competent Scaffolder (basic green card)Erect, modify, dismantle tube and coupler GI tubular scaffold up to defined height / complexity. Covers reading approved drawings, correct coupler torque, bracing patterns, tie installation, platform assembly.Every crew member on erection work.
Advanced ScaffolderAdvanced / specialist scaffolding beyond basic tube and coupler: suspended, cantilever, flying, bridge-over configurations. Additional training required.Site supervisor level for high-rise and complex-configuration jobs.
Scaffold Site SupervisorSupervise crews, read and interpret PE-approved drawings, coordinate with site inspector, handle non-conformance, maintain erection logbook.Minimum one per crew; two per crew on larger jobs.
DOSH Competent Person for InspectionInspect erected scaffold and affix green / yellow / red tag. Separate credential from scaffolder certification (handled by our inspection service line, not by the erection crew). See green tag inspection page.Separate inspector attends site; typically our DOSH-certified competent person or client appointed inspector.

Green card is checked by DOSH officers during random site inspections. We maintain crew credentials on file and provide copies for client HSE submissions on request. Scaffolder shortage is real in the Malaysian market and we invest in training to maintain our bench.

04 / Related services

Scaffolding service pages.

Need an erection or dismantling crew?

WhatsApp us the project location, scaffold scope and height, whether material is yours or ours, and target start date. Same-day indicative quote and crew mobilisation planning.