Earthworks contractor in Sarawak.
Cut and fill, mass haul, platform creation and hillside earthworks across Sarawak (Sarawak), delivered integrated with slope stabilization, retaining walls, and drainage as one CIDB G7 package. Project-specific mobilisation, typically 3 to 7 days. ISO 9001:2015. Compaction and testing to BS 6031, BS 1377, JKR-SPJ Section 2 and MS 1227.
Why Sarawak earthworks needs integrated engineering.
Sarawak's development spans soft coastal and estuarine ground near Kuching, Sibu and Bintulu that needs ground improvement before filling, and interior hill sites that need cut-slope stabilization. Dispersed sites and long logistics make single-contract delivery of earthworks plus slope plus drainage the practical choice.
Earthworks plus everything that holds it.
Cut and fill, mass haul
Cutting from high ground, hauling to fill, compaction to 95 to 98 percent MDD. Heavy plant for large volumes; field density testing per layer.
Platform and hillside creation
Sloping ground transformed into buildable platforms. Stabilized cut slopes, retaining walls between platforms, slope protection.
Drainage and erosion control
Perimeter drains, sediment traps, horizontal drains, and DOE-compliant ESCP during the works.
Integrated slope and retaining
Soil nailing, shotcrete and retaining walls delivered in the same sequence as the earthworks, under one contract.
Federal-grade engineering, brought to Sarawak.
Infraconcrete is a CIDB Grade G7 geotechnical and earthworks contractor with 100+ delivered projects and 5 million m2 of slope stabilized nationally, including federal expressway and rail corridor scope. The same engineering team that delivers federal-grade work brings that documentation discipline and QA chain to Sarawak projects. Full portfolio at /projects/.
Earthworks services for Sarawak.
→ Earthworks + slope stabilization (one package) · Hillside earthworks · Cut and fill · Earthworks contractor · Earthworks design and build
→ Earthworks hub · Land creation · Ground improvement · Slope stabilization
Have a Sarawak site that needs to become a platform?
Send topography, the development planned, and the schedule. Same-day response with a cut and fill estimate and integrated scope. CIDB G7 + ISO 9001:2015.
Localities we cover in Sarawak.
Earthworks and integrated slope, retaining and drainage across Sarawak: Kuching, Miri, Sibu, Bintulu, Kota Samarahan, Sri Aman, Kapit, Limbang, Serian, Bau. Same-day to project-specific site response and engineering supervision. CIDB G7 (highest grade), ISO 9001:2015. Built and tested to BS 6031, BS 1377, BS 5930, Eurocode 7, JKR-SPJ Section 2 and MS 1227.