Earthworks + slope stabilization · One CIDB G7 package · Hillside sites

Earthworks and slope stabilization contractor in Malaysia.

Infraconcrete Construction Sdn Bhd delivers earthworks and slope stabilization as one integrated package on hillside and cut-and-fill sites across Malaysia. CIDB Grade G7 (highest contractor grade), ISO 9001:2015 certified, holding CE01 (earthworks), CE08 (slope works) and CE21 (geotechnical) under one registration. Cut and fill, structural backfill, soil nailing on cut slopes, shotcrete, retaining and reinforced-earth walls, horizontal drains, drainage and erosion control, all under one contract, one programme and one QA chain. No interface gaps between trades. Real integrated projects: Bandar Serendah 540,000 m3 backfill with 7 retaining structures, Eco Terraces Phase 2 Semenyih 120,000 m3 earthworks with 11,000 m2 retaining wall, Alam Impian Township across Precincts 6 to 10.

G7
CIDB highest grade, no tender limit
540,000 m3
Backfill + 7 structures, one site
5M m2
Slope stabilized to date
ONE
Contract, earthworks + slope
Engineering note For a hillside site where the earthworks and the slope works are really one job, your point of contact is the Infraconcrete engineering desk. Send the cut-and-fill drawings and balance plus the slope or retaining design (or the survey, soil report and platform levels). Same-day quote with an integrated method, plant schedule, programme, compaction and testing plan, and one price under a single CIDB G7 contract. CIDB G7 + ISO 9001:2015. WhatsApp the engineering desk →
01 / Why one package

Why bundle earthworks with slope works under one specialist.

On flat land, earthworks and slope stabilization can be separate contracts without much harm. On a hillside development they cannot. The batter you cut a slope to, the compaction of the fill behind a wall, and the drainage set into a platform are the same decisions that decide whether the slope moves. Splitting them across two contractors builds a boundary into the works, and that boundary is exactly where distress appears. Here is what changes when one CIDB G7 contractor carries both.

No interface gap, no finger-pointing

When earthworks and slope works sit in separate contracts, a moving slope or a cracked wall triggers a dispute over whose scope failed. Under one contract there is one responsible party for the cut, the fill, the wall and the drainage. One method statement, one programme, one liability.

Cut trimmed to the design batter

Soil nail and shotcrete designs assume a specific cut face angle and bench geometry. When the same crew cuts and stabilizes, the excavated face is trimmed to the batter the design actually assumes, not left over-steep for a later specialist to correct or under-cut and re-profiled at cost.

Backfill placed to the wall design

Retaining and reinforced-earth walls are only as good as the structural backfill behind them. One contractor places fill in 200 to 300 mm lifts, tests to 98 percent MDD, and loads the wall against tested fill. No handover of a wall built against fill someone else placed to an unknown standard.

Drainage built in, not retrofitted

Horizontal drains, weepholes, cascade drains and subsoil drains are set as the fill and walls rise. Groundwater is the single most common failure driver on Malaysian slopes; building drainage into the sequence is far cheaper and more reliable than coring drains into a distressed slope after the event.

One programme, monsoon-aware

Open cut faces left through a wet season are a liability. A single programme sequences the cut so faces are stabilized as they are exposed, and coordinates earthworks output with the nailing and facing crews so the site is never carrying a large unstabilized exposure into heavy rain.

One QA chain, one as-built

Compaction records, soil nail test results and drain positions are logged in one ISO 9001:2015 chain. The consultant receives a single coherent as-built rather than two sets of records that disagree at the earthworks-to-slope boundary. Cleaner submissions to JKR, DOE and the local authority.

02 / What the package delivers

One contract, first strip to stabilized slope.

Bulk earthworks, cut and fill

Site clearing and topsoil strip, bulk cut and haul, bulk fill placement and compaction, platform formation and subgrade trim. General fill to 95 percent MDD, structural backfill to 98 percent MDD, in controlled 200 to 300 mm lifts to BS 6031, MS 1227 and JKR-SPJ Section 2.

Cut slope soil nailing

Soil nailing on hillside cut slopes with shotcrete and welded mesh facing to hold the cut face at the design batter. Drilled-and-grouted high-yield bar, full testing programme, to JKR-SPJ Section 7 and the JKR Slope Engineering Manual. See /soil-nailing/.

Retaining and reinforced-earth walls

Reinforced-earth, reinforced-concrete and gravity walls to retain platforms and cut faces, built against tested structural backfill. Reinforced-earth systems available through group company Starwall (sole STRATA Geosystems distributor in Malaysia). See /retaining-walls/.

Horizontal drains and slope drainage

Sub-horizontal drains to relieve pore pressure where groundwater drives instability, plus cascade drains, berm drains, weepholes and subsoil drains built into the platform as it forms. See /horizontal-drains/.

Erosion and sediment control

ESCP-compliant erosion and sediment control: silt traps, sediment basins, turfing, erosion-control matting and slope vegetation to DOE and JPS requirements, coordinated with the earthworks sequence rather than added at the end. See /erosion-control/.

Ground improvement and detention

Where soft ground or high runoff needs it, soil improvement and flood detention ponds are folded into the same package, as delivered at Alam Impian across Precincts 6 to 10. See /ground-improvement/.

03 / Integrated project track record

Real hillside sites delivered as one package.

Every project below is a real Infraconcrete scope delivered within the 2022 to 2026 window. Project name, location and scope are shown; client names are not disclosed per confidentiality. These are the sites where earthworks and slope works were carried together under one contract.

ProjectLocationIntegrated scope delivered
Bandar SerendahHulu Selangor, Selangor540,000 m3 backfill with 7 retaining structures on one site, including the SAMAMARA industrial facility platform earthworks. Bulk earthworks plus retaining works, single package.
Eco Terraces Phase 2Semenyih, Selangor (Mukim Bandar Batu 18)120,000 m3 earthworks with 11,000 m2 retaining wall and soil nailing on the cut slopes. Cut, fill, retaining and slope stabilization together.
Alam Impian TownshipShah Alam, SelangorEarthworks, soil improvement, soil nailing, retaining walls, drainage and a flood detention pond across Precincts 6 to 10. Full integrated township package.
Mukim SentulKuala Lumpur5,000 m2 reinforced-earth wall with 6,000 m2 platform earthworks. Platform formation and retaining under one scope.
Bandar Ulu Kelang Spine RoadGombak, Selangor100 ft internal spine road with earthworks, drainage and retention for a 3-storey terrace cluster. Roadworks earthworks plus slope drainage.
Welbuilder Earthworks Phase 5BJeram, Kuala SelangorEarthworks with retaining wall, lots 14214 to 14223. Bulk earthworks and retaining structure combined.
Scientex Park Hulu LangatHulu Langat, SelangorMixed-development earthworks, lots 53655, 53656 and 4955. Platform earthworks for staged development.
Centralfields Shah Alam U10Shah Alam, SelangorSlope stabilization stages 1 to 4 on township platform slopes (2024 to 2025). Staged slope works over earthworked platforms.

Full portfolio, including federal corridor slope scope, at /projects/. Over 100 projects delivered across 9 or more Malaysian states.

04 / Plant fleet

What we mobilise to the platform.

PlantRole on an integrated earthworks and slope site
50-tonne excavatorBulk cut in residual soil and weathered rock, mass excavation, deep bench cutting, loading dump trucks
20-tonne excavatorSlope trimming to design batter, bench forming, drain excavation, working the soil nail and facing platforms
Articulated dump truck (ADT), 30 and 50 tonneCut-to-fill haul across the site and to stockpile, off-road hillside haul on soft or graded haul roads
BulldozerFill spreading, lift levelling, haul-road forming, topsoil stripping and stockpiling
Motor graderPlatform and subgrade trim to level and crossfall, final surface preparation before compaction test
Smooth-drum vibratory roller (12 to 22 tonne)Primary compaction of general fill and granular structural backfill in 200 to 300 mm lifts
Padfoot (sheepsfoot) rollerCompaction of cohesive fill, kneading action for clay and silty residual soil lifts
Pneumatic-tyre (PTR) rollerProof-rolling, sealing the surface, compaction near wall facings where vibration must be limited
Vibratory plate compactorConfined compaction against retaining wall faces, around drains and in trench backfill
Hydraulic breakerBreaking hard rock and boulders in cut, trenching through cemented layers, demolition of old structures

Plant is stated generically. Field density is verified with a nuclear density gauge, by sand-replacement or by DCP, with CBR to specification and Proctor for maximum dry density. Fleet is scaled to the cut-and-fill balance and programme.

05 / Production and programme

How fast the platform comes up.

Indicative production on typical Malaysian residual soil, per working shift. Actual output depends on haul distance, weather, ground conditions and the interaction with the slope works, which is exactly why the two scopes are programmed together rather than in series.

ActivityIndicative rateBasis
Bulk cut, residual soil2,000 to 4,000 m3 per shift50-tonne excavator with 30-tonne ADT haul
Bulk fill placement and compaction1,500 to 3,000 m3 per shift per crew200 to 300 mm lifts, roller pass regime to spec
Topsoil strip and stockpile5,000 to 10,000 m2 per shiftDozer and excavator, stripping to stockpile
Subgrade preparation and final trim3,000 to 6,000 m2 per shiftGrader trim, proof-roll, density test

The earthworks programme is sequenced against the slope works so cut faces are stabilized as they are exposed, backfill is tested before the wall is loaded, and drains are installed as the fill rises. Multi-crew mobilisation is available for tight programmes or large hillside platforms. See /cost-programme-guide/ for the cost and programme reference.

06 / Standards and compaction control

Codes we build to.

StandardCoverage
BS 6031Code of practice for earthworks (primary earthworks execution code)
BS 1377Methods of test for soils for civil engineering purposes
BS 5930Code of practice for ground investigations
BS EN 1997 (Eurocode 7)Geotechnical design on a partial-factor basis
MS 1227Malaysian standard for soil compaction
JKR-SPJ Section 2Federal earthworks specification for highway and government works
JKR-SPJ Section 7Federal slope and soil nail specification (slope scope of the package)
JKR Slope Engineering ManualMalaysian federal slope-works alignment for the stabilization scope
Compaction controlRequirement
General fillMinimum 95 percent of maximum dry density (MDD)
Structural backfill (behind walls, to platforms)Minimum 98 percent MDD
Lift thickness200 to 300 mm compacted lifts, moisture near Proctor optimum
Field density verificationNuclear density gauge, sand-replacement or DCP; CBR to spec

Test records are logged and issued per ISO 9001:2015 before the wall is loaded or the platform is released. See /standards/ and the /geotechnical-design-guide/.

07 / FAQ

Developers, consultants and main contractors usually ask:

Why deliver earthworks and slope stabilization as one integrated package? +
On hillside and cut-and-fill sites the earthworks and the slope stabilization are the same problem seen twice. The batter a cut ends up at, the compaction of structural backfill behind a wall, and the drainage set into a platform all decide whether the slope stands. When one CIDB G7 contractor carries both, there is no interface gap: the cut is trimmed to the batter the soil nail design assumes, backfill is placed and tested to the wall design, and drains are built into the fill as it rises rather than retrofitted after failure. Splitting the two contracts builds a boundary into the works, and that boundary is where distress and disputes appear. Infraconcrete delivers cut and fill, soil nailing, shotcrete, retaining walls, horizontal drains and drainage under one contract, one programme and one QA chain.
What CIDB grade and categories cover integrated earthworks and slope works? +
CIDB Grade G7 (highest contractor grade, no upper tender value limit). The categories that matter for an integrated package are all held in-house: CE01 (earthworks), CE08 (slope works), CE21 (geotechnical), plus B04 (specialised building works) and M15 (mechanical). Because CE01, CE08 and CE21 sit under one registration, the bulk earthworks, the retaining structures and the slope stabilization all run under a single G7 contract. PPK Registration 0120220822-WP104845, valid 22 August 2022 to 13 December 2027. ISO 9001:2015 certified.
What scope does the integrated package cover? +
Site clearing and topsoil strip; bulk cut and haul; bulk fill placement and compaction to 95 percent MDD general fill and 98 percent MDD structural backfill; platform formation and subgrade trim; cut slope battering and benching; soil nailing with shotcrete and welded mesh facing; retaining and reinforced-earth walls; horizontal drains; surface drainage, cascade drains, silt traps and erosion control; and flood detention ponds where required. First strip to stabilized, drained, vegetated slope, all under one programme with as-built records per ISO 9001:2015.
Which standards govern the earthworks and the slope works? +
Earthworks to BS 6031, soil testing to BS 1377, ground investigation interpreted per BS 5930, geotechnical design per BS EN 1997 (Eurocode 7), compaction referencing MS 1227. On federal and government works the earthworks follow JKR-SPJ Section 2 and the slope and soil nail scope follows JKR-SPJ Section 7 and the JKR Slope Engineering Manual. One contractor holding both means the earthworks spec and the slope spec are read together, not in isolation.
How do you avoid interface gaps between the earthworks and slope trades? +
A single programme and a single engineer-in-charge. The cut sequence is planned so faces are stabilized as they are exposed rather than left open through a monsoon. Structural backfill behind walls is placed in 200 to 300 mm lifts and density-tested to 98 percent MDD before the next lift, so the wall is never loaded against loose fill. Horizontal drains and weepholes are set as the fill or wall rises, not cored in afterwards. The same QA chain records the compaction, the nail tests and the drain positions, so the consultant receives one coherent as-built rather than two that disagree at the boundary.
What compaction control do you apply behind retaining structures? +
General fill to a minimum 95 percent MDD; structural backfill behind retaining and reinforced-earth walls to a minimum 98 percent MDD. Fill is placed in 200 to 300 mm lifts using smooth-drum vibratory or padfoot rollers, with pneumatic-tyre and plate compaction close to the wall face to avoid over-stressing the facing. Field density is confirmed by nuclear density gauge or sand-replacement, moisture is kept near Proctor optimum, and CBR is checked on the subgrade. Records are logged and issued per ISO 9001:2015 before the wall is loaded.
Can you handle a full hillside development, cut, fill, retaining and drainage together? +
Yes, this is the flagship scope. Bandar Serendah in Hulu Selangor involved 540,000 m3 of backfill with 7 retaining structures on one site, including the SAMAMARA industrial facility platform earthworks. Eco Terraces Phase 2 in Semenyih (Mukim Bandar Batu 18) combined 120,000 m3 of earthworks with an 11,000 m2 retaining wall and soil nailing on the cut slopes. Alam Impian Township in Shah Alam took earthworks, soil improvement, soil nailing, retaining walls, drainage and a flood detention pond across Precincts 6 to 10. See /hillside-development/ for the hillside scope and /projects/ for the full portfolio.
How do I verify your CIDB grade and get a quote? +
CIDB Malaysia runs a public contractor verification portal at cidb.gov.my. Search by company name (Infraconcrete Construction Sdn Bhd) or PPK Registration Number (0120220822-WP104845) to see current grade, categories, validity and status independent of any contractor claim. The ISO 9001:2015 certificate is verifiable through the issuing body. For a quote, send the earthworks drawings and cut-and-fill balance plus the slope or retaining design (or the survey, soil report and platform levels). Same-day response with an integrated method, plant schedule, programme, QA and testing plan, and one price.
08 / Related references

Where this connects.

Earthworks and slope on the same hillside site?

Send the cut-and-fill drawings and balance plus the slope or retaining design (or the survey, soil report and platform levels). Same-day quote with an integrated method, plant schedule, programme, compaction and testing plan, and one price under a single CIDB G7 contract. CIDB G7 + ISO 9001:2015 + integrated hillside track record.

Infraconcrete Construction Sdn Bhd
8B, Jalan SS22/25, Damansara Jaya, 47400 Petaling Jaya, Selangor, Malaysia
+60 16-428 1214 · WhatsApp · engineer@infraconcrete.co · Google Maps
CIDB G7 · ISO 9001:2015 · Sole STRATA Geosystems distributor in Malaysia (through Starwall Sdn Bhd)