Infraconcrete← Back to home
Earthworks · Pahang

Earthworks contractor in Pahang.

Cut and fill, mass haul, platform creation and hillside earthworks across Pahang (Pahang), delivered integrated with slope stabilization, retaining walls, and drainage as one CIDB G7 package. Project-specific mobilisation for east-coast and highland sites, with monsoon-period scheduling. ISO 9001:2015. Compaction and testing to BS 6031, BS 1377, JKR-SPJ Section 2 and MS 1227.

KuantanGenting HighlandsCameron HighlandsBentongRaubTemerlohJerantutFraser's HillBera
G7
CIDB highest grade
100+
Projects delivered
5M m2
Slope stabilized
ISO
9001:2015
Engineer's note For earthworks across Pahang, send the master plan or survey plus platform levels. Same-day response with a cut-and-fill balance view, plant schedule, programme, compaction and testing plan, and one price under a single CIDB G7 contract covering earthworks plus any slope, retaining and drainage scope. CIDB G7, ISO 9001:2015. WhatsApp the engineering team →
01 / Pahang context

Why Pahang earthworks needs integrated engineering.

Pahang covers Malaysia's highland development belt (Genting, Cameron Highlands, Fraser's Hill) and the East-coast interior. Highland earthworks mean steep hill cuts, benched terracing and fill on mountainous terrain, all under high rainfall and demanding erosion-control obligations. This is integrated earthworks-and-slope territory: platform formation, cut-slope stabilization and drainage delivered as one sequence.

02 / What we deliver

Earthworks plus everything that holds it.

Cut and fill, mass haul

Cutting from high ground, hauling to fill, compaction to 95 to 98 percent MDD. Heavy plant for large volumes; field density testing per layer.

Platform and hillside creation

Sloping ground transformed into buildable platforms. Stabilized cut slopes, retaining walls between platforms, slope protection.

Drainage and erosion control

Perimeter drains, sediment traps, horizontal drains, and DOE-compliant ESCP during the works.

Integrated slope and retaining

Soil nailing, shotcrete and retaining walls delivered in the same sequence as the earthworks, under one contract.

03 / Track record

Federal-grade delivery, national coverage.

Federal corridor experience in the Pahang region includes slope and geotechnical works along the East Coast Rail Link (ECRL) Section 3 alignment (42 km CH88+467 to CH130+718 in the Pahang to Terengganu corridor, and 64 km CH87+642 to CH151+365 in the Pahang to Kelantan corridor).

Full portfolio at /projects/ (project name, location and scope only; client names not disclosed per confidentiality).

04 / Explore the earthworks cluster

Earthworks services for Pahang.

→ Earthworks + slope stabilization (one package) · Hillside earthworks · Cut and fill · Earthworks contractor · Earthworks design and build

→ Earthworks hub · Land creation · Ground improvement · Slope stabilization

Have a Pahang site that needs to become a platform?

Send topography, the development planned, and the schedule. Same-day response with a cut and fill estimate and integrated scope. CIDB G7 + ISO 9001:2015.

Regional coverage

Localities we cover in Pahang.

Earthworks and integrated slope, retaining and drainage across Pahang: Kuantan, Genting Highlands, Cameron Highlands, Bentong, Raub, Temerloh, Jerantut, Bera, Fraser's Hill, Gambang, Maran. Same-day to project-specific site response and engineering supervision. CIDB G7 (highest grade), ISO 9001:2015. Built and tested to BS 6031, BS 1377, BS 5930, Eurocode 7, JKR-SPJ Section 2 and MS 1227.

Infraconcrete Construction Sdn Bhd
8B, Jalan SS22/25, Damansara Jaya, 47400 Petaling Jaya, Selangor, Malaysia
+60 16-428 1214 · WhatsApp · engineer@infraconcrete.co · Google Maps
CIDB G7 · ISO 9001:2015 · Sole STRATA Geosystems distributor in Malaysia (through Starwall Sdn Bhd)