Infraconcrete← Back to home
Earthworks · Johor

Earthworks contractor in Johor.

Cut and fill, mass haul, platform creation and hillside earthworks across Johor (Johor), delivered integrated with slope stabilization, retaining walls, and drainage as one CIDB G7 package. Project-specific mobilisation, typically 1 to 2 days. ISO 9001:2015. Compaction and testing to BS 6031, BS 1377, JKR-SPJ Section 2 and MS 1227.

Johor BahruIskandar PuteriPasir GudangSenaiSkudaiKulaiBatu PahatMuarKluangMersingSegamatPontian
G7
CIDB highest grade
100+
Projects delivered
5M m2
Slope stabilized
ISO
9001:2015
Engineer's note For earthworks across Johor, send the master plan or survey plus platform levels. Same-day response with a cut-and-fill balance view, plant schedule, programme, compaction and testing plan, and one price under a single CIDB G7 contract covering earthworks plus any slope, retaining and drainage scope. CIDB G7, ISO 9001:2015. WhatsApp the engineering team →
01 / Johor context

Why Johor earthworks needs integrated engineering.

Johor's Iskandar Malaysia corridor drives heavy demand for platform earthworks: industrial parks, data centres, logistics hubs and mixed townships. Sites range from soft coastal and estuarine ground that needs ground improvement before filling, to inland hill-cut platforms that need slope stabilization and retaining as the earthworks proceed.

02 / What we deliver

Earthworks plus everything that holds it.

Cut and fill, mass haul

Cutting from high ground, hauling to fill, compaction to 95 to 98 percent MDD. Heavy plant for large volumes; field density testing per layer.

Platform and hillside creation

Sloping ground transformed into buildable platforms. Stabilized cut slopes, retaining walls between platforms, slope protection.

Drainage and erosion control

Perimeter drains, sediment traps, horizontal drains, and DOE-compliant ESCP during the works.

Integrated slope and retaining

Soil nailing, shotcrete and retaining walls delivered in the same sequence as the earthworks, under one contract.

03 / National standing

Federal-grade engineering, brought to Johor.

Infraconcrete is a CIDB Grade G7 geotechnical and earthworks contractor with 100+ delivered projects and 5 million m2 of slope stabilized nationally, including federal expressway and rail corridor scope. The same engineering team that delivers federal-grade work brings that documentation discipline and QA chain to Johor projects. Full portfolio at /projects/.

04 / Explore the earthworks cluster

Earthworks services for Johor.

→ Earthworks + slope stabilization (one package) · Hillside earthworks · Cut and fill · Earthworks contractor · Earthworks design and build

→ Earthworks hub · Land creation · Ground improvement · Slope stabilization

Have a Johor site that needs to become a platform?

Send topography, the development planned, and the schedule. Same-day response with a cut and fill estimate and integrated scope. CIDB G7 + ISO 9001:2015.

Regional coverage

Localities we cover in Johor.

Earthworks and integrated slope, retaining and drainage across Johor: Johor Bahru (JB), Iskandar Puteri, Pasir Gudang, Senai, Skudai, Kulai, Batu Pahat, Muar, Kluang, Mersing, Segamat, Pontian, Tebrau, Nusajaya. Same-day to project-specific site response and engineering supervision. CIDB G7 (highest grade), ISO 9001:2015. Built and tested to BS 6031, BS 1377, BS 5930, Eurocode 7, JKR-SPJ Section 2 and MS 1227.

Infraconcrete Construction Sdn Bhd
8B, Jalan SS22/25, Damansara Jaya, 47400 Petaling Jaya, Selangor, Malaysia
+60 16-428 1214 · WhatsApp · engineer@infraconcrete.co · Google Maps
CIDB G7 · ISO 9001:2015 · Sole STRATA Geosystems distributor in Malaysia (through Starwall Sdn Bhd)