Soil nail contractor in Malaysia.

Infraconcrete Construction Sdn Bhd is a specialist soil nail installation contractor across Malaysia. CIDB Grade G7 (highest contractor grade), ISO 9001:2015 certified. 23 client projects delivered 2022 to 2026 including federal corridor scope: EKVE 450,000 m squared protected, ECRL Section 3 along 42 km and 64 km of alignment, Lingkaran Tengah Utama Kelantan. Five soil nail applications: hillside cut slopes, distressed slope remediation, top-down basement excavation, road widening at toe of cut, bridge abutment soil nail walls. All five BS 8081 tests delivered in-house with calibrated load cells. Coverage all 13 states plus Labuan.

G7
CIDB highest grade
23
Projects 2022-2026
EKVE + ECRL
Federal corridor experience
5 tests
BS 8081 in-house
Engineering note For soil nail installation across Malaysia, your point of contact is the Infraconcrete engineering desk. Send the consultant's drawings and spec (or slope geometry and soil report). Same-day quote with crew availability, install rate, supervision plan, QA programme, testing schedule, and price. CIDB G7 + ISO 9001:2015. WhatsApp the engineering desk →
01 / What we install

Five soil nail installation applications.

Hillside cut slope soil nailing

Standard hillside township and commercial development cut. Nail length 8-15 m typical, spacing 1.5-2.5 m grid, inclination 10-15 degrees below horizontal. Drilled-and-grouted Y20 to Y32 high-yield steel or self-drilling hollow bar (R32-R76) for collapsing-ground conditions. Shotcrete and welded mesh facing.

Distressed slope remediation

Existing slope showing visible movement, cracks, post-monsoon distress. 24-48 hour emergency mobilisation Klang Valley. Investigation tests + interim stabilisation + permanent works execution. Pairs with horizontal drains where groundwater is the failure driver.

Top-down basement excavation

Commercial basements, MRT and LRT cut-and-cover stations, dense urban hillside basements. Basement perimeter cut in 1.5-2 m lifts top-down with nails and shotcrete before each lift below. Avoids sheet pile vibration that damages neighbours.

Road widening at toe of cut

Federal road or expressway lane addition adjacent to existing cut slope. Sequential staged works with traffic management coordination, staged closures, night-shift mobilisation. Live-traffic working method, concrete barrier and hoarding deployment.

Bridge abutment soil nail wall

Permanent bridge abutment retention or toe stabilisation for highway and rail corridor widening. Higher working load (200-400 kN per nail), permanent DCP corrosion protection (double corrosion protection per BS 8006-2 Annex C), concrete panel facing for aesthetic.

02 / Crew structure

Who turns up on site.

RoleResponsibility
Site engineer (1)Engineer-in-charge, consultant liaison, daily diary, exception decisions, test data review
Site supervisor (1)Crew foreman, daily progress, safety briefing, toolbox talks
Drilling rig operator (1-2)Drill rig operation, hole alignment, drilling-mud control, depth measurement
Bar handling crew (2-3)Bar storage, cutting, centraliser fitting, insertion into drilled hole
Grouting crew (1-2)Cementitious grout mixing, pressure grouting through grout pipe, grout return monitoring
Shotcrete crew (3-4, on facing days)Mesh installation, shotcrete spraying (wet-mix or dry-mix), curing
Testing crew (when scheduled)Load cell calibration, pullout test execution, creep monitoring, data logging
Traffic management crew (live carriageway works)Cone deployment, signage, lane closure, traffic flagging per authority TM plan

Standard crew runs 8-15 personnel depending on scope. Multi-crew mobilisation possible for tight programmes or large sites (over 5,000 m squared face area).

03 / Federal corridor project track record

What we've delivered since 2022.

ProjectLocationScopeYear
EKVE (East Klang Valley Expressway)Klang ValleySlope and geotechnical scope, 450,000 m squared protected. Soil nailing on federal expressway cut and fill slopes.2024
ECRL Section 3Pahang-Terengganu corridorSlope works along 42 km of alignment (CH88+467 to CH130+718). Soil nailing on cut slopes adjacent to live alignment.2023
ECRL Section 3Pahang-Kelantan corridorSlope works along 64 km of alignment (CH87+642 to CH151+365). Soil nailing scope included.2023
Lingkaran Tengah Utama KelantanKuala Krai to Sg LakitFederal road, Kg Laloh to FT66 junction. Slope soil nailing scope.2025
Centralfields Shah Alam U10SelangorSlope stabilisation stages 1-4 (4 stages 2024-2025). Soil nailing on township platform slopes.2024-2025
IWK Septic Tank Slope RectificationPuchong, SelangorSlope failure rectification at sewage treatment site. Emergency soil nailing.2023
Eco Terraces Phase 2Semenyih, SelangorEarthworks and retaining wall, Mukim Bandar Batu 18. Soil nailing on cut slopes.2024
Welbuilder Phase 5BJeram, Kuala SelangorEarthworks and retaining wall, lots 14214-14223. Soil nailing scope.2024

Full project portfolio at /projects/ (project name + location + scope only; client names not disclosed per confidentiality).

04 / Soil nail testing programme (5 tests)

BS 8081 Table 7 delivered in-house.

TestPurposeFrequency
Investigation testsLoaded to failure pre-production to verify grout-soil bond and inform spacing3-5 sacrificial nails per site
Suitability testsConfirm production technique works on actual site soil1 in 30 nails typical
Acceptance testsProof load every Nth production nail at 1.25 to 1.5 times design working load1 in 10 production nails typical
Proof testsProject-specific frequency on representative nailsPer consultant spec
Creep testsSustained-load movement per log-decade; less than 1 mm between 1-10 min log-decade allowable per BS 8081 Table 7Selected production nails per spec

All five tested in-house with calibrated load cells, digital data logging, ISO 9001:2015 traceable records. Results submitted to consultant for sign-off before subsequent production nail batch proceeds.

05 / Standards we install to

Codes governing our installation work.

StandardCoverage
BS 8006-2:2011UK Code of Practice for soil nailing (primary design and execution code)
FHWA-NHI-14-007US FHWA Soil Nail Walls Reference Manual
BS EN 14490:2010Execution of special geotechnical works, soil nailing
BS 8081:2015+A2:2018Grouted anchors; soil nail testing per Table 7
JKR Slope Engineering ManualMalaysian federal slope-works alignment
JKR-SPJ Section 7Federal road earthworks and slope specification
BS 4449 / BS EN 10080Reinforcing steel bar specification
BS EN 14199Micropile (for hollow-bar soil nail context)
ACI 506 / BS EN 14487Shotcrete specification for facing
06 / Coverage all 13 states

Crew mobilisation across Malaysia.

  • Klang Valley (Selangor, KL, Putrajaya, Cyberjaya): same-day site response, daily crew availability.
  • Penang, Kedah, Perlis: 1 to 2 day mobilisation.
  • Perak, Negeri Sembilan, Melaka, Johor: 1 to 2 day mobilisation.
  • Pahang, Kelantan, Terengganu: 2 to 3 day mobilisation, East-coast monsoon-period scheduling.
  • Sabah, Sarawak, Labuan: project-specific mobilisation 3 to 7 days.

Emergency mobilisation (post-failure, monsoon distress, JKR or LLM directive response): 24-48 hours Klang Valley, 72 hours other West Malaysia, 3-7 days East Malaysia.

07 / FAQ

Consultants and main contractors usually ask:

What CIDB grade and categories do you hold? +
CIDB Grade G7 (highest contractor grade, no tender value limit). Categories B04 (specialised building works), CE01 (earthworks), CE08 (slope works), CE21 (geotechnical), M15 (mechanical). PPK Registration 0120220822-WP104845, valid 22 August 2022 to 13 December 2027. ISO 9001:2015 certified quality management system.
Can I verify your CIDB grade independently? +
Yes. CIDB Malaysia operates a public contractor verification portal at cidb.gov.my. Search by company name (Infraconcrete Construction Sdn Bhd) or PPK Registration Number (0120220822-WP104845). Returns current grade, categories, validity, and registration status independent of any contractor representation.
How fast can you mobilise an emergency soil nail crew? +
Klang Valley: same-day site survey, 24-48 hours from instruction to first crew on site. Other West Malaysia: 24-72 hours. East Malaysia: project-specific 3-5 days. Emergency mobilisation has a premium but is routine for active slope-distress events. Coordination with JKR or LLM for federal corridor emergency works.
Do you install only or also design? +
Both routes available. Install-only contracts: we install per consultant's design, on-site QA per BS 8006-2 / JKR-SPJ. Design-and-build contracts: Infraconcrete carries the geotechnical engineering responsibility plus installation; PI insurance available on project basis. See /soil-nailing-design-and-build-malaysia/ for the design-and-build route.
What insurance do you carry? +
Public liability, workmen's compensation, project-specific Contractor's All Risk (CAR), Erection All Risk (EAR), Professional Indemnity (PI) for design-and-build contracts. Cover limits scaled to project value. Certificate copies provided with contract documentation.
How is your install rate? +
Site-dependent. Indicative day rates per single crew on Malaysian residual soil: 8-15 nails per day per drilling rig depending on nail length. For a typical 8m nail at 2m grid, single crew installs 80-150 linear metres of nail per day plus shotcrete facing 20-40 m squared per day. Multi-crew for tight programmes.
Soil nail contractor vs slope contractor, what's the difference? +
Soil nail contractor: specialist in soil nailing technique only. Slope contractor: covers integrated slope stabilisation system (soil nailing + shotcrete + rock bolting + rockfall + retaining walls + horizontal drains + drainage + monitoring). Most Malaysian slope projects need multiple techniques; integrated slope contractor often coordinates better than soil-nail-only specialist plus separate slope contractor. Infraconcrete delivers both: standalone soil nail scope or integrated under one CIDB G7 contract.
08 / Related references

Where this connects.

Need a soil nail contractor for your project?

Send drawings and spec (or slope geometry + soil report). Same-day quote with crew availability, install rate, supervision, QA programme, testing schedule, and price. CIDB G7 + ISO 9001:2015 + EKVE / ECRL track record.