Infraconcrete← Back to home
Main Contractor Gabion Sub-Package Partner · CIDB G7

Specialist gabion sub-contractor for main contractors.

Infraconcrete is positioned as a specialist gabion sub-contractor to Malaysian main contractors. This is our primary target customer. You have won or are bidding a JKR road, JPS river, or private civil infrastructure contract and the scope includes a gabion component: retaining wall, culvert headwall, river bank protection, scour countermeasure, flood mitigation levee, or drainage apron. Rather than build an in-house gabion capability for one project, you sub-let that portion to a specialist. We take the gabion portion of your scope under back-to-back subcontract. You keep the main contract relationship and the client interface. We deliver the gabion scope with design-build turnkey (PE-signed drawings, material sourcing, installation, documentation handover) or build-to-spec (your drawings and spec, our execution). Single-point accountability for the gabion scope stays with us under our CIDB G7 licence and ISO 9001:2015 QA framework.

Single-point
Gabion scope accountability
2-3 weeks
Post-award mobilisation
Back-to-back
Sub-contract structure
Pre-tender
Pricing support available
01 / Why main contractors sub-let gabion

Four reasons.

Specialist discipline. Gabion design and installation sit outside the typical main contractor skill set. Design needs specific hydraulic and geotechnical judgement; installation needs specific crew skills around mesh handling, lacing, rock placement, and inspection. Sub-letting puts the work with someone who does it every project.

Critical path focus. Your main contract critical path is usually earthworks, pavement, structures, or bridge deck. Gabion is a specialist component that benefits from parallel execution without pulling your crew or your PE time off the critical path.

Single-point accountability. One specialist sub-contractor owns the gabion scope: design (if design-build), supply, install, hand-over. If something fails, you know where to go.

Supply chain speed. Specialist contractors already have wire mesh supplier relationships, rock source relationships, DOSH-recognised competent crews on call, BEM Professional Engineers in the partner network. Mobilisation is fast.

02 / Our sub-package scope

What we take on.

JKR road scope

Retaining walls, culvert headwalls and wingwalls, bridge approach retaining, scour countermeasures at water crossings, drainage apron, rockfall catchment at highway cut slopes.

JPS and DID river scope

Bank revetment, channel lining, flood mitigation levee facing, apron work at hydraulic structures, confluence point armouring, emergency scour hole repair.

Private civil scope

Hillside retaining, estate access road walls, resort and plantation infrastructure, factory site cut-fill, residential hillside development.

Bridge construction scope

Pier and abutment scour protection, bridge approach retaining, apron work. Typically combined with another bridge sub-package (bearing, deck furniture, etc.).

03 / How we engage

From enquiry to sub-contract execution.

StageWhat we deliver
Pre-tender enquiryIndicative rate schedule, scope clarification, sub-letter of intent if required
Tender supportTechnical input to your BoQ, alternative method statements, value-engineered options
Post-awardBack-to-back sub-contract drafted on your flow-down terms
Design reviewOur PE reviews the gabion design (design-build) or validates your spec (build-to-spec)
ProcurementWire mesh ordered, rock source confirmed, geotextile procured
MobilisationCrew mobilised within 2-3 weeks of NTP; East Malaysia 3-4 weeks
DeliveryInstallation per approved method statement, course-by-course inspection photos
Hand-overPE-signed as-built, material certificates, inspection records, maintenance notes
Related references

Explore the gabion cluster.

By state

Gabion per Malaysian state.

Gabion project needs a design-build partner?

WhatsApp us the project location, scope (river, wall, scour, flood, culvert), approximate dimensions, target start date, and whether you are a main contractor looking for a sub-package partner or a direct client. Same-day indicative quote and design-review lead time.