Infraconcrete← Back to home
Gabion Sabah · Pan Borneo + Kinabatangan + KK · CIDB G7

Gabion contractor in Sabah.

Sabah coverage is part of Infraconcrete nationwide service. Mobilisation within 3 to 4 weeks from Petaling Jaya base, with crew flown in, wire mesh freighted by sea or air per project size, and rock sourced locally from Sabah quarries. Towns covered: Kota Kinabalu (KK), Sandakan, Tawau, Lahad Datu, Keningau, Semporna, Beaufort, Kudat, Papar, Tuaran, Kundasang, Ranau, Kinabatangan, Lahad Datu. Core work: Pan Borneo Highway Sabah phase retaining walls and bridge scour sub-package, Sungai Kinabatangan and Sungai Padas bank protection under JPS Sabah and DID, oil palm estate infrastructure (access roads, drainage, culvert, bridge), Mount Kinabalu area resort and road retaining, west and east coast erosion revetment. PVC-coated double-twisted hexagonal mesh for saline and tropical exposure. CIDB G7, ISO 9001:2015.

Pan Borneo
Sabah phase sub-package
Kinabatangan
Longest Sabah river
Oil palm
Estate infrastructure scope
3-4 weeks
Mobilisation window
01 / Sabah coverage

Towns served.

ZoneTowns
West coastKota Kinabalu, Papar, Beaufort, Sipitang, Tuaran, Kota Belud, Kudat, Likas, Penampang
InteriorKeningau, Tambunan, Ranau, Kundasang, Tenom, Nabawan
East coastSandakan, Lahad Datu, Semporna, Tawau, Kunak, Kinabatangan, Beluran
NorthKudat, Kota Marudu, Pitas, Banggi
02 / Pan Borneo Sabah

Highway sub-package.

Pan Borneo Highway Sabah phase runs from Sindumin at the Sarawak border through Beaufort, Papar, Kota Kinabalu, Ranau, Lahad Datu, Tawau, with alignment also Kudat to KK. Package by package the scope includes gabion retaining walls on steep cut-and-fill sections, culvert headwalls at tributary crossings, bridge pier and abutment scour countermeasures at river crossings, and embankment protection. Main-contractor sub-package work typical.

03 / Kinabatangan and Padas rivers

JPS + DID flood work.

Sungai Kinabatangan is the longest river in Sabah (560 km) draining much of central and east Sabah into the Sulu Sea. The lower basin (Kinabatangan district, Beluran, Pitas) has persistent flood exposure. Sungai Padas drains the Crocker Range into Beaufort and beyond. Sungai Segama drains south-east Sabah into Darvel Bay near Lahad Datu. JPS Sabah river engineering and DID flood mitigation include gabion bank protection on all of these.

04 / Oil palm estates

Private direct.

Sabah has a large oil palm estate footprint. Estate access road retaining walls, drainage apron at estate culverts, bridge scour protection at estate river crossings, and boundary retaining are all scope for direct estate-group enquiry or sub-package work on their main contractor upgrades. Typical estate groups: IOI, Sime Darby Plantation, FGV, Genting Plantations, Boustead, Kuala Lumpur Kepong.

Related references

Explore the gabion cluster.

By state

Gabion per Malaysian state.

Gabion project needs a design-build partner?

WhatsApp us the project location, scope, approximate dimensions, target start date, and whether you are a main contractor looking for a sub-package partner or a direct client. Same-day indicative quote and design-review lead time.