Construction Equipment · Resource Hub

Construction equipment & machinery.

The drilling rigs, grout plants, shotcrete machines, staging platforms, and ancillary equipment that turn a slope cut into a stabilized, faced, drained slope. Anchor / micropile rigs (specialist anchor rig series, international equipment supplier, equivalent international rig, equivalent international rig, specialist rig manufacturer, equivalent international rig), grout plants (colloidal mixers, piston pumps, mud balance), wet-mix and dry-mix shotcrete (international shotcrete pump manufacturer, equivalent shotcrete manufacturer, wet-mix concrete pump), staging (suspended scaffold, mast climbers, tube-and-coupler, system scaffold), jet grout rigs, ground anchor stressing jacks, mesh fabrication, hand-held tools. Aligned with BS EN 14490, BS 8081, BS EN 14487, BS EN 1537, ACI 506, JKR Slope Engineering Manual. By Infraconcrete - CIDB G7 specialist geotechnical contractor with in-house equipment and crews.

8
Equipment categories
In-house
Crews + plant
G7
CIDB highest grade
100+
Projects delivered
Why we own our plant We don't sub the geotechnical work to chains of vendors - the drilling crew, the grout plant, the shotcrete team, and the supervisor are all Infraconcrete. That's why programmes hold and quality is consistent across the projects we've delivered. If your project needs same-day mobilisation in the Klang Valley or scheduled mobilisation across Malaysia, send the brief to WhatsApp +60 16-428-1214 for a same-day engineering response.
Navigation

Jump to a topic.

01 / Drilling Rigs (Anchor / Soil Nail)

The workhorse of geotechnical contracting.

Rig type / modelHole dia / depthBest for
specialist anchor rig / 806-3 / 807-3 G276-180 mm / 6-30 mSoil nail, rock bolt, micropile - track / spider mount, self-traversing
specialist anchor rig 909 / 902-3up to 200 mm / up to 50 mHeavy ground anchor, deep micropile, jet grout
equivalent international rig CT20 / CT2476-200 mm / 30-60 mAnchor + micropile + investigation drilling
specialist drilling rig-5, SM-8.1, SR-3076-200 mm / up to 50 mItalian specialist anchor rigs
specialist crawler rig, M9, B125, M1476-300 mm / up to 60 mVersatile anchor / micropile / pile
equivalent international rig MC450 / MC60076-200 mm / up to 50 mCompact anchor / micropile rigs - tight access
specialist rig manufacturer (International Drilling Machines) A series76-200 mm / up to 50 mItalian anchor rigs - cost-competitive alternative
Hand-held auger / specialist anchor rig manufacturer 802-3 mini50-100 mm / 3-6 mTight urban sites, restricted access, shallow nails

Drilling method by ground

  • Rotary (top hammer): standard for soil + weathered rock, fast in Grade III-VI
  • Down-the-hole (DTH) hammer: for hard rock (Grade I-II granite), straighter holes
  • Rotary-percussive: hybrid, common for mixed-face conditions
  • Sacrificial casing (water flush) drilling: for cohesionless soil to prevent hole collapse
  • Cable percussion (shell + chisel): traditional, used in soft soil + investigation

Productivity benchmarks

  • Soil nail (32 mm threadbar, 12 m, residual soil): 4-8 nails / day per rig
  • Rock bolt (25 mm threadbar, 6 m, weathered rock): 6-12 bolts / day per rig
  • Ground anchor (4-strand, 25 m, mixed face): 1-3 anchors / day per rig
  • Micropile (200 mm dia, 20 m): 1-2 piles / day per rig
02 / Micropile & Pile Rigs

For underpinning, ground improvement, and foundation works.

Rig typePile dia / depthUse
specialist anchor rig 909 / equivalent international rig M9-M16150-300 mm / 20-40 m micropileUnderpinning, micropile, anchored wall foundations
specialist pile rig-15 / BG-28 / BG-39600-2000 mm / 30-80 m bored pileBored pile foundations, secant / contiguous bored pile walls
specialist pile rig-65 / SR-95600-1800 mm / up to 70 mBored pile, CFA pile
HSP Hydraulic / IHC pile hammer250-500 mm RC sq. driven pileDriven pile foundations
Vibroflot rig (Bauer / Cape)600-1000 mm stone columnStone column ground improvement (soft soil)
Cement deep mixing rig (Toa, equivalent international rig)600-1500 mm soil-cement columnDeep mixing ground improvement
03 / Grout Plants

Where the bond strength is made.

Plant components

  • Cement silo / bagged storage: typically 30-50 ton silo on large projects, bagged for small
  • Water tank with flow meter: chilled water for hot-day hydration control
  • Colloidal mixer (high-shear): colloidal mixer 50/100, colloidal mixer, colloidal mixer - 200-500 L drum, 1500-3000 rpm impeller. Produces stable, low-bleed grout
  • Piston pump: international piston pump manufacturers - 5-10 bar pressure, variable flow
  • Hose lines: 25-50 mm OD reinforced rubber, 50-200 m run to drill rig
  • Mud balance: daily / per-batch density check (target 1.85-1.95 g/cm^3)
  • Bleed test apparatus, cube moulds: 7-day + 28-day QA

Grout mix QA

  • OPC w/c 0.40-0.45 (target by design)
  • Plasticiser 0.5-1 percent (lignosulphonate or polycarboxylate)
  • Target 28-day cube: 30-50 N/mm^2 depending on application
  • Bleed less than 2 percent at 3 hours per BS EN 445
  • Density 1.85-1.95 g/cm^3 by mud balance
  • Pre-construction trial mix and certified test reports
Colloidal vs paddle mixer. Colloidal mixers produce stable, low-bleed grout suitable for permanent geotechnical works. Paddle mixers (drum mixers, low shear) produce unstable grout that bleeds and segregates - acceptable for temporary works but NOT for permanent anchors / nails per BS 8081 / EN 1537. Specify colloidal mixer in the contract spec.
04 / Shotcrete Machines

Wet-mix and dry-mix sprayed concrete.

MethodEquipmentOutputBest for
Wet-mix shotcreteConcrete batcher / transit mixer + concrete pump (wet-mix concrete pump 1005 D, wet-mix concrete pump, wet-mix concrete pump) + nozzle + air supply (compressor 8-12 bar, 6-10 m^3/min)6-12 m^3/hourLarge slope facing, tunnel primary lining, bulk volume work
Dry-mix shotcrete (gunite)dry-mix machine / dry-mix machine / Reed dry-mix machine + pre-blended dry materials + water at nozzle1-3 m^3/hourSmall / repair work, remote sites, vertical narrow strips
Steel-fibre shotcrete (SFRS)Wet-mix as above + fibre dosing equipment (steel fibres 30-60 kg/m^3 added at batcher)4-8 m^3/hourTunnel primary lining, high-toughness slope facing
Robotic / mechanised shotcreteRobotic arm (equivalent shotcrete manufacturer, Meyco, international shotcrete pump manufacturer) on truck-mounted base10-20 m^3/hourTunnel primary lining at scale, infrastructure spec

Shotcrete mix

  • Cement: OPC + 5-10 percent silica fume (durability)
  • Aggregate: 0-10 mm graded
  • w/c: 0.40-0.50 (wet-mix)
  • Slump at hopper: 75-100 mm
  • Accelerator at nozzle: 4-8 percent (alkali-free preferred)
  • Steel fibre dose 30-60 kg/m^3 for SFRS
  • Target 28-day cube: 30-50 N/mm^2

Application

  • Standoff distance from face: 1.0-1.5 m
  • Application angle: perpendicular to face
  • Layer thickness per pass: 50-75 mm; multiple passes for thickness greater than 100 mm
  • Mesh installation between passes for thick sections
  • Rebound: 5-15 percent (wet-mix), 15-30 percent (dry-mix)
  • Curing: 7-day moist or curing compound
05 / Staging Platforms

Getting drilling rigs and crews onto the slope face.

Platform typeSlope angleUseCapacity
Suspended scaffold (gondola, swing stage)60-90 deg + overhangingSoil nail drilling, shotcrete, mesh installation, light works1-3 person, 200-400 kg
Mast climber (mast-climber P, mast-climber, Alimak)Vertical to 80 degSustained vertical works, tall walls / cuts2-4 person + equipment, 1-3 ton
Tube-and-coupler scaffoldup to 60 degStable platform for drilling rig + grout plant adjacentMulti-person, heavy plant
System scaffold (system scaffold manufacturer Allround, system scaffold)up to 60 degModular scaffold for staged work; faster erection than tube + couplerMulti-person, heavy plant
Excavator-mounted basketany (vehicle-accessible terrain)Inspection, scaling, light works at height2-person, 250 kg max
Mobile elevating work platform (MEWP) - boom lift / scissor liftany (level-ground access)Mid-height inspection, finishing2-person, 250 kg
Cable-supported platformany (very tall / cliff-face)Specialist - rope access teams, drilled anchors1-2 person specialist crew
Track-mounted spider rig (self-platform)any (rough terrain)specialist anchor rig G2 self-traverses without separate scaffoldn/a (rig is the platform)
Slope-platform mapping. Selection driver is slope angle, total face height, drilling depth, equipment weight, and access. For a 30 m vertical-to-near-vertical permanent slope (typical hillside development cut): suspended scaffold for upper half, system scaffold for lower bench. For a 60-degree 15 m slope: tube-and-coupler scaffold or system scaffold. For a 45-degree gentle slope: track-mounted spider rig directly on the cut face. Working at height + working from suspended platforms requires DOSH (Department of Occupational Safety and Health) certified scaffolders, signed off scaffold inspection records, fall arrest harnesses + lanyards.
06 / Anchor Stressing Jacks

Tensioning prestressed anchors to working load.

Jack typeCapacityUse
Multi-strand stressing jack (stressing-jack manufacturer, DSI, VSL)500-3000 kNMulti-strand permanent ground anchors (4-12 strand)
Mono-strand jack200-300 kN per strandSingle-strand stressing for sequential loading
Threadbar stressing jack (DSI, Williams, specialty threadbar manufacturer)300-2000 kNthreadbar / threadbar anchors and tiebacks
Hydraulic centre-hole jackup to 5000 kNHigh-load anchors, specialty applications

All stressing jacks calibrated annually with traceable certificates. Pressure gauges + load cells dual-check during stressing. Acceptance test loads typically 1.25-1.5 x design working load, hold for 10-30 min, creep monitored. Per BS 8081 / BS EN 1537.

07 / Jet Grout Rigs

Soil-cement columns by high-velocity grout jetting.

SystemColumn diaPressureUse
Single-fluid jet (cement only)400-800 mm200-400 barSoft cohesive soil treatment
Double-fluid jet (cement + air)800-1500 mm300-500 barLarger columns, granular soil
Triple-fluid jet (cement + air + water)1500-2500 mm400-500 barVery large columns, deep ground improvement, tunnel pre-support umbrella

Used for: tunnel portal pre-support umbrella (combined with mechanical pre-support), basement excavation perimeter cut-off, ground improvement under existing structures (compensation grouting), and deep mixing for soft soil treatment. Per BS EN 12716, ASTM D2002 series.

08 / Mesh & Fabrication

Welded BRC, hex mesh, double-twist, rope nets.

Mesh typeWire / apertureUse
BRC welded mesh A6 / A8 / A10 / A126-12 mm wire / 200 mm c/cShotcrete reinforcement (slope facing, soil nail face plate distribution)
Hex mesh (chicken wire)2.0-2.5 mm / 25-50 mmLight surface protection, vegetation backing
Double-twist hex mesh (gabion / Reno)2.7-3.0 mm / 60 x 80 mmGabion baskets, mattress, drape mesh (rock netting)
Steel chain link2.0-3.5 mm / 50-100 mmRockfall mesh, slope drape mesh
High-tensile rope net (international manufacturers)8-12 mm rope / 250-500 mm rhombicDrape mesh on rocky outcrops, anchored mesh systems, rockfall protection

All mesh hot-dip galvanised to BS EN 10244-2 Class A or W. Polymer over-coated (PVC, polyamide) for aggressive environments or 50+ year design life. Mesh fabrication / cutting / tying done on site or in workshop.

09 / Ancillary Equipment

Compressors, generators, surveying, monitoring.

Power & air

  • Air compressor: 8-12 bar, 6-15 m^3/min (international equipment supplier XAS, Doosan, Sullair)
  • Generator: 50-200 kVA diesel (Cummins, Caterpillar, Doosan, FG Wilson)
  • Power distribution: site-grade IP65 distribution boards

Water & drainage

  • Water tank: 1000-10,000 L on site for drilling / grouting / shotcrete
  • Water pumps: submersible / surface for dewatering
  • Wastewater settlement tank for shotcrete + drilling slurry

Survey & setting out

  • Total station (Leica TS-series, Trimble) for slope geometry
  • GNSS receiver (Leica GS-series, Trimble R-series) for project setup
  • Laser distance meter, hand-held inclinometer
  • Pre-marked drilling pattern templates / paint markers

Monitoring

  • Inclinometer, vibrating wire piezometer, surface monument (see QA & Testing for full list)
  • Total station survey for displacement
  • Crackmeter for tension cracks
  • Anchor load cell for stressed anchors
  • Rain gauge tipping bucket
  • Real-time telemetry console for Class III/IV slopes
10 / Standards Reference

Codes and references.

TopicReference
Soil nail executionBS EN 14490, FHWA-IF-99-016, JKR Slope Engineering Manual
Ground anchor executionBS 8081, BS EN 1537, EAD 160004, FHWA-IF-99-015
Micropile executionBS EN 14199, FHWA-NHI-05-039
Sheet pile installationBS EN 12063, BS EN 10248-1
Shotcrete (sprayed concrete)BS EN 14487-1 / 14487-2, BS EN 14488 series, ACI 506R / 506.1R / 506.2R
Bored / driven pile executionBS EN 1536 (bored), BS EN 12699 (displacement)
Jet groutingBS EN 12716, ASTM D2002 series, FHWA-IF-13-026
Scaffolding / stagingBS EN 12811, BS 5973 (tube + coupler), DOSH guidance Malaysia
Compressed air, power, generatorsBS EN ISO 8873 (compressors), local IEC / SIRIM standards
Frequently asked

Equipment questions.

What drilling rig for soil nailing? +
Anchor / micropile rig with rotary or rotary-percussive head: specialist anchor / micropile rigs, equivalent international rig, specialist drilling rig series, specialist crawler rig/M9, equivalent specialist rigs, specialist anchor rig. Hole 100-150 mm dia, 6-15 m length, 10-20 deg below horizontal. Track-mounted for accessible terrain, scaffold-mounted for steep / inaccessible.
What's the typical shotcrete equipment? +
Wet-mix (preferred): batcher / transit mixer + wet-mix concrete pump 1005 / wet-mix concrete pump / wet-mix concrete pump pump + nozzle + 8-12 bar compressor. Dry-mix (gunite): dry-mix machine / dry-mix machine + dry pre-blend + water at nozzle. SFRS adds steel-fibre dosing. Output: wet-mix 6-12 m^3/hour, gunite 1-3 m^3/hour.
What staging platforms for steep slopes? +
Suspended scaffold (gondola) for vertical to overhanging - drilling, shotcrete capable. Mast climber (international mast-climber manufacturers) for sustained vertical work on tall walls. Tube-and-coupler / system scaffold for slopes up to 60 deg. Track-mounted spider rig (specialist anchor rig G2) self-traverses on rough terrain - no separate scaffold. Selection by slope angle + height + equipment weight + access.
How is grout plant set up? +
Cement silo / bagged storage + water tank + colloidal mixer (colloidal mixer, colloidal mixer, colloidal mixer) + piston pump (piston pump, piston pump) + hose lines + mud balance + cube mould + bleed test apparatus. Mix: OPC + w/c 0.40-0.45 + plasticiser 0.5-1 percent. Target 30-50 N/mm^2 cube. Density 1.85-1.95 g/cm^3. Bleed less than 2 percent. Pre-construction trial mix.
Why colloidal mixer instead of paddle mixer? +
Colloidal mixers (high-shear, 1500-3000 rpm) produce stable, low-bleed, segregation-resistant grout suitable for permanent works per BS 8081 / BS EN 1537. Paddle mixers (drum, low shear) produce unstable grout that bleeds and segregates - acceptable for temporary works only. Specify colloidal mixer in contract spec for permanent geotechnical works.

Equipment-driven project needs the right contractor?

Send the project specification - we mobilise our in-house drilling rigs, grout plants, shotcrete machines, staging, and crews. CIDB G7, ISO 9001:2015. 100+ projects delivered. Same-day site response.

Cross-references

Read more.

Infraconcrete Construction Sdn Bhd
8B, Jalan SS22/25, Damansara Jaya, 47400 Petaling Jaya, Selangor, Malaysia
+60 16-428 1214 · WhatsApp · engineer@infraconcrete.co · Google Maps
CIDB G7 · ISO 9001:2015 · Sole STRATA Geosystems distributor in Malaysia (through Starwall Sdn Bhd)