Geogrid (StrataGrid) supply and install on the East Coast.
Starwall is the STRATA Geosystems Malaysia distributor; Infraconcrete is the CIDB G7 installer. Cross-state delivery to Kelantan, Terengganu, East Pahang within 6-9 hours from PJ HQ. StrataGrid uniaxial PET for ECRL MSE walls and reinforced soil slopes; biaxial PP for federal road sub-base over coastal alluvium. Monsoon-resilient design under north-east monsoon (Nov-Mar). Manufactured by STRATA Geosystems.
ECRL corridor, Petronas Kerteh, interior slope works.
- ECRL Section 3 embankments through Kelantan, Terengganu, East Pahang: StrataGrid Biaxial PP under road sub-base + StrataTex HSR basal mats on alluvium. One of Southeast Asia's largest single-corridor geosynthetic deployments.
- Petronas Kerteh O&G corridor: StrataGrid PET in MSE walls and platform reinforcement; combined with HDPE geomembrane for hydrocarbon secondary containment.
- Interior Kelantan / Hulu Terengganu slope works: StrataGrid PET in MSE walls + StrataWeb vegetated facing for monsoon-resilient cut slopes.
- Coastal protection at Kemaman, Setiu, Besut: StrataTex HSR + woven geotextile under rock revetment combined with StrataGrid for embankment reinforcement.
- State and federal roads: biaxial PP under road sub-base over alluvial subgrade.
From the authoritative list.
- East Coast Rail Link (ECRL): 64 km / 320,000 m drilled drains with extensive geosynthetic-reinforced embankment scope through Kelantan / Terengganu / East Pahang.
Programme around dry windows.
Major geogrid placements and MSE wall fill operations are sequenced for dry window (April-October) where possible. North-east monsoon (November-March) peak rainfall events exceed 300 mm/day; exposed geogrid covered within manufacturer UV window. Erosion control mat (coir, TRM) supports vegetation establishment on RSS faces during monsoon transition.
Continue reading.
Geogrid for an East Coast project?
Send the project parameters. Same-day response from PJ HQ.