Infraconcrete
Soil Nailing · Penang

Soil Nailing Contractor in Penang.

Penang Hill granite slope reinforcement, Tanjung Tokong / Tanjung Bungah hillside developer cut platforms, Bayan Lepas industrial park slopes, Seberang Perai infrastructure works. Steel nails drilled at engineered angles, grouted, and faced with shotcrete or modular panels. To BS 8006-2, FHWA-NHI-14-007, JKR Slope Specifications. MBPP submission native. Penang Hill Slope Guideline compliance. CIDB G7, ISO 9001:2015.

George TownBukit MertajamBayan LepasTanjung BungahTanjung TokongAir ItamPenang HillBalik PulauButterworthSeberang Perai
100+
Projects delivered
5M m²
Slope stabilized
JKR I-IV
Slope class
G7
CIDB highest
Engineer's note For Soil Nail work across Pulau Pinang (Penang), Infraconcrete mobilises crews, drilling rigs, grout plant, and shotcrete. CIDB G7, ISO 9001:2015. Designed and installed to BS / EN / Eurocode 7 / FHWA / JKR specifications. Same-day site response from the engineering team. Send the project geometry + soil report for fast scope + programme advisory. WhatsApp the engineering team →
01 / Penang context

Granite hillside, MBPP submission, industrial growth.

Three drivers: Penang Hill / Air Itam / Tanjung Tokong / Tanjung Bungah hillside developments cut into granite - soil nailing is the dominant slope reinforcement when rock conditions don't justify rock bolting; Bayan Lepas industrial parks (Free Trade Zone, semiconductor / E&E manufacturing platforms); and Seberang Perai infrastructure and industrial growth corridor. MBPP requires the Penang Hill Slope Guideline submission for projects above 76m (250 ft) elevation - we author and stamp these as part of the design-build package.

02 / Why we deliver in Penang

MBPP-compliant, granite-experienced.

Penang Hill Slope Guideline native

We've authored, stamped, and successfully submitted Penang Hill Slope Guideline packages for hillside developers. JKR Class I-IV slopes covered.

CIDB G7 + ISO 9001:2015

Eligible for JKR Penang, MBPP, MBSP, federal panels. State-recognized contractor.

Granite drilling experience

Penang Hill bedrock is granite under residual soil. We use down-the-hole hammers + carbide bits for the granite, then transition to soil-nail drilling above. Calibrated grouting protocol for the rock-soil interface.

Ferry-mobilized crews

Equipment moves across via Penang ferry / bridge. Crews based on island during execution. Same-day response from KL HQ.

Penang soil nailing job needs engineering?

Penang Hill, MBPP, industrial or coastal. Same-day response.

Regional sub-locality coverage

Localities we cover.

Soil Nail Contractor service across all major sub-localities of Pulau Pinang (Penang): George Town, Bayan Lepas, Tanjung Bungah, Tanjung Tokong, Pulau Tikus, Air Itam, Penang Hill, Balik Pulau, Butterworth (Seberang Perai), Bukit Mertajam, Juru, Prai, Nibong Tebal, Kepala Batas, Batu Ferringhi, Teluk Bahang, Sungai Pinang, Gurney Drive. Same-day site response and engineering supervision. CIDB G7 (highest grade), ISO 9001:2015. Designed and installed to BS 8006-2, FHWA-NHI-14-007, Eurocode 7, JKR Slope Engineering Manual.