Infraconcrete← Back to home
For Quantity Surveyors

Specialist sub-contractor that respects QS discipline.

Transparent BoQ rates, schedule of rates pricing, disciplined variation orders, clean progress claims. CIDB G7. ISO 9001:2015. The geotechnical specialist that QS firms recommend because the budget holds and the paperwork is clean.

Schedule of rates
Transparent pricing
VO discipline
No surprises
100+
Projects
G7
CIDB
Engineer's note For QS firms costing geotechnical scope, we provide budget-grade unit rates + lead times + production data anchored in delivered Malaysian projects. Send the BoQ structure for cost data + benchmarking. WhatsApp the engineering team →
01 / What QS firms get

Pricing that holds.

Schedule of rates pricing

BoQ rates that reflect real production rates and market input costs, reviewed annually. No headline lowballs followed by inflated VOs.

Variation order discipline

VOs raised promptly with substantiation: design change, ground conditions discovered, scope change. Pricing per the schedule of rates. No surprise claims at handover.

Clean progress claims

Monthly progress claims with measurement records, photos, and test certificates. Aligned with QS valuation methodology. Quick certification turnaround.

Final account discipline

Final accounts substantiated with measurement records, signed VOs, and reconciled material logs. We close out projects, not leave them open with disputes.

02 / Pricing structure

How geotechnical works are typically priced.

ItemPricing basis
Soil nailingPer nail (drilling + bar + grout) plus testing rates
Guniting / shotcretePer m² of finished face by thickness, plus mesh and accelerator
Rock boltingPer bolt with separate rates for drilling, supply, testing, head detailing
Retaining wallsPer m² of face by wall type, plus foundations, drainage, backfill
Sheet pilingPer m² of pile area, plus mobilization, extraction, walings
Horizontal drainsPer m drilled, plus setup, slotted pipe, filter sock, discharge
EarthworksPer m³ cut/fill, plus haul distance, disposal, compaction testing
Rockfall barriersPer linear metre by energy class, plus foundations, access
03 / FAQ

QS firms usually ask:

Pricing transparency? +
Schedule of rates with substantiated production rates. No headline lowballs.
VO handling? +
Raised promptly with substantiation. Priced per schedule of rates. No surprise claims.
Progress claims? +
Monthly with measurement, photos, test certificates. Aligned with QS valuation methodology.
Budget estimates pre-tender? +
Yes. Send rough scope and we'll respond with budget bands per service. Same-day on WhatsApp.

Need a geotechnical specialist your team can recommend?

Send the project brief and the procurement model. We'll respond with rates, capability statement, and references.