For Consulting Engineers

Specialist sub-contractor for your design.

For C&S, M&E, geotechnical, environmental, drainage, hydrology, and civil consultants. We execute your design with documentation, method statements, and field-verified workmanship. BS / EN / Eurocode 7 native. IEM / BEM / ACEM-aligned. CIDB G7, ISO 9001:2015. The specialist you call when the geotechnical scope needs to be done right.

BS · EN · Eurocode
Standards-native
IEM aligned
Method-statement grade
100+
Projects with consultants
G7
CIDB
Engineer's note For C&S, geotechnical, and M&E consultants, we work natively as the specialist contractor under your design - method statements, RFI responses, buildability input, value engineering. Send the design package for engagement discussion. WhatsApp the engineering team →
01 / What consultants get

The specialist that respects your design.

Design execution, not redesign

We deliver to your specification. Where buildability needs to be discussed, we raise it formally with method statements and RFIs, never quietly substitute.

Method statements at IEM grade

Method statements per BS/EN/Eurocode 7/JKR specs, submitted ahead of works. ITP (Inspection and Test Plan), HIRARC, JSA all included.

Test results back to you

Pull-out tests, cube/core strengths, piezometer/inclinometer readings, reported to you before next-stage works proceed. Closed-loop verification.

RFI and variation discipline

Design queries raised through formal RFI. Variations costed transparently. No silent assumptions, no surprise claims.

02 / Standards we work to

The codes your design references.

StandardApplication
BS 6031Earthworks
BS 8002 / BS 8004Earth retaining structures / Foundations
BS 8006Reinforced soils (RE/MSE walls)
BS 8081 / EN 1537Ground anchors and rock bolts
BS EN 12063Sheet pile execution
BS EN 14487Sprayed concrete
BS EN 1997 / Eurocode 7Geotechnical design
FHWA-NHI-14-007Soil Nail Walls
ETAG 027 / EAD 340059Rockfall protection
ACI 506 / AASHTOShotcrete / ground anchors
JKR Standard SpecificationsHighway and government works
03 / FAQ

Engineers usually ask:

How do you handle design queries? +
Formal RFI. We raise buildability concerns in writing, never silently substitute.
Method statement quality? +
Per BS/EN/Eurocode 7/JKR. ITP, HIRARC, JSA included.
Testing reports? +
Pull-out, cube/core, piezometer/inclinometer, reported before next-stage works.
Can you bid for tendered scope? +
Yes. CIDB G7 with B04, CE01/06/08/21/36, M15. Eligible for any tier of public/private project.

Have a design that needs the right specialist?

Send the design brief and we'll respond with method-statement positioning, programme, and pricing.